#SportOfKings
#NotRefillingYet
#NotRefillingYet
It is a cheapy. Called omier wasp nano.
I got it for Christmas and I'm digging it. The machining is not pretty, but it vapes really well. A bit stumpy-like
Todd reviewed it as his surprise rda of 2017
You can't control the weather bro, sorry to hear about your issue. Hope it gets resolved ASAP for ya, I know what that kind of crap is like. We were locked into -30 for a pretty long stretch and had tons of stuff freeze, luckily no damage. Now it's a skating rink outside because over a foot of snow has melted in the past 24 hours and it's going to freeze up this afternoon and be terrible then snow another footok I got all the mods in the current batch up to what I call "ready for electronics install" for me that means all machine work is done, mods are all put together with doors and chip covers, squonk holes are cut, mods are all shaped and sanded and I am up to the point that I am ready to start installing the 510's...
the mods are not completely final sanded or finished polished at this point yet because to install the 510's the mods have to be clamped in a vise for the 510 opening to be machined for each different 510 option, mods are then engraved and finish polished then chips go in and all that other good stuff happens that completes the mod... that's the good news and so far this has been right about up to schedule....
now the not so good news...
on early Sunday morning it went down to 5 degrees here in NY and I winded up having a main water pipe freeze and burst in my basement wall which caused a good amount of flooding and a huge mess. all of my CNC equipment is right in front of my water heaters in my basement and I had to wind up taking it all apart and tearing down a wall to repair this damage. I didn't say anything about this before because I figured this would only take me a couple of days to deal with, but at this point I'm not going to be able to get the contractor to finish and put the new wall up before Tuesday of next week. I can't put my CNC machine back together until the new wall is up, and obviously I need that to do the 510 holes and engraving and stuff so at this point it looks like I'm going to be about a week delayed give or take a bit...
this shouldn't be too big of a delay and I'm still expecting to get the mods done by the end of the month, but at this point I don't think there is any way I'm actually going to make it by my original official end date of Jan 21st
I'm very sorry guys and I hate delays and I feel like a dick especially after the last batch was delayed a few weeks too, I really wanted this one to come in on schedule, but this was just beyond my control and hopefully only an extra week or so past where I really wanted to be here
ok few pics of the mods as they sit waiting for the basement to be reconstructed I have delayed sending out final invoices because I like to send them out right when I'm starting to actually install the 510's so invoicing will still be delayed a few more days while I deal with this mess but will be sent out before the end of the weekend I think
Ivan, send me an email at my user name here @mindspring.com, I have a few extra mods I built in this batch I'll let you know what I have and we work something out buddy, no need to drive up
Of all my devices the BAM is one of my favorites I never go anywhere without it. You can't fathom how great it is till you actually use it. Congrats your gonna love it.hope repairs went smoothly, turbo
starting to get really excited, without letting myself get carried away
Will be my second, beezOf all my devices the BAM is one of my favorites I never go anywhere without it. You can't fathom how great it is till you actually use it. Congrats your gonna love it.
Sent from my SM-G955U using Tapatalk
Well then you already know[emoji41], I was hoping to get my 2nd in this next batch but since he is only doing a small run I will wait for the next one.Will be my second, beez